{"id":7494,"date":"2023-11-07T01:44:00","date_gmt":"2023-11-06T17:44:00","guid":{"rendered":"http:\/\/www.oktcz.com\/?p=7494"},"modified":"2023-11-10T18:50:47","modified_gmt":"2023-11-10T10:50:47","slug":"expro-completes-well-cementing-project-in-the-deepwater-us-gulf-of-mexico","status":"publish","type":"post","link":"https:\/\/www.oktcz.com\/en\/industry-news-en\/expro-completes-well-cementing-project-in-the-deepwater-us-gulf-of-mexico.html","title":{"rendered":"Expro completes well cementing project in the deepwater US Gulf of Mexico"},"content":{"rendered":"\n
\"\"<\/figure>\n\n\n\n

Energy services provider Expro successfully completed a well cement placement project for a large international operator in the US Gulf of Mexico, delivering an inner-string cementing on a subsea well\u2019s 22-in. surface casing in a water depth of approximately 2,000 m in the Mississippi Canyon area. When integrated with Expro\u2019s other well construction technologies, the company\u2019s Cure technology range \u2013 including SeaCure, QuikCure and CoreCure \u2013 offers a comprehensive package for ultimate cement placement.
Expro\u2019s Cure technologies allowed the operator to overcome ongoing offset well challenges. These included prolonged wait on cement (WOC) periods when transitioning directly from the jet string to the 22-in. surface casing, and tasks associated with drilling out a 22-in. shoe track.
The Cure technology range was added to Expro\u2019s portfolio within the company\u2019s well construction product line as part of their acquisition of DeltaTek in February 2023.\uff082023-11-07\uff09<\/p>\n","protected":false},"excerpt":{"rendered":"

Energy services provider Expro successfully completed a well cement placement project for a large international operator in the US Gulf of Mexico, delivering an inner-string cementing on a subsea well\u2019s 22-in. surface casing in a water depth of approximately 2,000 m in the Mississippi Canyon area. When integrated with Expro\u2019s other well construction technologies, the …<\/p>\n

Expro completes well cementing project in the deepwater US Gulf of Mexico<\/span> \u66f4\u591a \u00bb<\/a><\/p>\n","protected":false},"":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"default","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":""},"categories":[40],"tags":[],"_links":{"self":[{"href":"https:\/\/www.oktcz.com\/en\/wp-json\/wp\/v2\/posts\/7494"}],"collection":[{"href":"https:\/\/www.oktcz.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oktcz.com\/en\/wp-json\/wp\/v2\/types\/post"}],"":[{"embeddable":true,"href":"https:\/\/www.oktcz.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oktcz.com\/en\/wp-json\/wp\/v2\/comments?post=7494"}],"version-history":[{"count":1,"href":"https:\/\/www.oktcz.com\/en\/wp-json\/wp\/v2\/posts\/7494\/revisions"}],"predecessor-version":[{"id":7497,"href":"https:\/\/www.oktcz.com\/en\/wp-json\/wp\/v2\/posts\/7494\/revisions\/7497"}],"wp:attachment":[{"href":"https:\/\/www.oktcz.com\/en\/wp-json\/wp\/v2\/media?parent=7494"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oktcz.com\/en\/wp-json\/wp\/v2\/categories?post=7494"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oktcz.com\/en\/wp-json\/wp\/v2\/tags?post=7494"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}